
0% read · 2 min left
Convert assessment results into the concrete starting numbers a program needs — training loads, target HR/pace zones, and measurable goals — so the goal→program engine has real inputs, not guesses.
Assessment exists to drive programming. Each baseline result becomes a specific input for the goal→program engine (program-design-process):
Make goals measurable (SMART): tie each goal to a re-testable metric and target value with a timeframe (e.g., "+3 reps on the push-up test in 8 weeks," "waist −4 cm in 12 weeks," "1.5-mile run −60 s in 12 weeks"). These targets define the re-test (retest-cadence) and the progression rules (progressive-overload-application).
Educational content only — not medical advice. Always consult a qualified professional for individualized guidance, especially around injury, pregnancy, or medical conditions.